| Home / Electronics & Electrical / Wires, Cables, Cable Assemblies / Power Cable / Heat Shinkable Indoor/outdoor Terminations |
Custom Search
|
| Project | testing Project | standard requiring | Result of the test | Conclusion |
| 35kv indoor,outdoor terminal station and the middle joining | worker is able to bear pressing frequently | 105kv,minDo not flash and hold in place with a net, does not puncture | 105kv,1minHave not flashed and hold in place with a net puncturing | pass |
| The part discharges and is tested | 39kv ≤20pc | 39kvh 4pc | pass | |
| Load circulation is tested, 3 week | 5hwhen hotting,3hcold,While heating, conductor temperature is 95 | Evaluated by the following tests | ||
| The part discharges and is tested | 39kvDischarging amount≤10pc | 39kvh4pc | pass | |
| Assault the voltage to test 1.2/50US Straight negative pole is each ten times | 25kv,Straight negative pole each ten times, allow to flash and hold once in place with a net, But does not write into the total experimental number of times | 250kvHave not flashed and hold in place with a net puncturing | pass | |
| The negative pole direct current is pressed and tested | 156kv/15min Do not flash and hold in place with a net, does not puncture | 156kv/15minHave not flashed and hold in place with a net puncturing | pass | |
| 4h Worker's voltage test frequently | 104kv/4h Do not flash and hold in place with a net, does not puncture | 104kv/4hHave not flashed and hold in place with a net puncturing | pass |
| Company: | Wuxi Xintengdongfang Cable Enclosure Co., Ltd. |
| Address: | Nancun Village,Yangjian Town,Xishan district,Wuxi city |
| Region: | wuxi city, Jiangsu, China |
| Contact Person: | Mr. Xiaodong Qian |
| Telephone: | 86-510-88731606 |
Heat-shrinkable Terminals And Middle Joints For